公司經營管理考核方法
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size季度考核方式,執行單位由審計監察部擔任。
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
several group number, then with b ± a, =c,c is is methyl b two vertical box between of accurate size. Per-2~3 measurement, such as proceeds of c values are equal and equal to the design value, then the vertical installation accurate. For example a, b, and c valueswhile on horizontal vertical errors for measurement, General in iron angle code bit at measurement level points grid errors, specific method is from baseline to methyl vertical box center line distance for a,, to b vertical box distance for b, list can measured
2、根底工作考核
根據建安公司?工程施工管理方法?匯編文件及其后印發的有關經營管理的相關文件精神,針對工程〔經理〕部和經濟實體進行工程法施工和經營管理過程,進行的根底管理工作檢查考核。采取月考核方式。執行單位由公司機關各職能部門擔任。
3、經營管理業績考核
主要根據公司各項經營方案指標,經營承包責任書、承包合同、崗位竟聘書等文件資料,對公司各部門、各經濟實體和各工程〔經理〕部的各項考核評價,包括指標完成情況考核、承諾實現情況考核、審計兌現考核等??己似诘陌才牛簷C關、經濟實體一般為季度考核和年度考核,工程〔經理〕部為年度考核和竣工考
內容來自淘豆網www.canything.com轉載請標明出處.